| Property | Tonnage ('000 tonnes) | Grade 3PGE + Au g/t | Max depth below surface (m)3 | Metal ratio Pt:pd:Rh:Au (%) | Contained precious metals 3PGE + Au kg | oz (Troy) | Base metals | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Ni ppm | Cu ppm | Ni tonnes | Cu tonnes | |||||||
| Inferred mineral resource | ||||||||||
| Rietfontein UMP‑ UMP1,2 | 2,831 | 4.35 | 550 | 63:30:0:7 | 12,320 | 396 | 1,900 | 800 | 5,310 | 2,190 |
| Project Total | 2,831 | 4.35 | 550 | 63:30:0:7 | 12,320 | 396 | 1,900 | 800 | 5,310 | 2,190 |
| ¹ | The Loskop Project is a JV with Western Platinum Mines (Lonmin), Mineral Resource quoted in 2PGE+Au, Ni and Cu by XRF |
| 2 | Inferred Resource defined on a portion of Rietfontein 70 JS for the Upper Mineralised Pyroxenite (UMP) with regard to which Platmin is negotiating final terms with Lonmin for the earn-in of 50% of Boynton’s interest in this mineral resource. Resources presented above reflect that Lonmin has earned 50% of the Loskop Project. |
| 3 | Vertical depth below surface. |