| Property | Tonnage ('000 tonnes) | Grade 3PGE + Au g/t | Max depth below surface (m)2 | Metal ratio Pt:pd:Rh:Au (%) | Contained precious metals 3PGE + Au kg | oz (Troy) | Base metals | |||
|---|---|---|---|---|---|---|---|---|---|---|
| Ni ppm | Cu ppm | Ni tonnes | Cu tonnes | |||||||
| Inferred mineral resource | ||||||||||
| Mphahlele ¹ | 47,736 | 4.47 | 1000 | 51:37:7:4 | 213,940 | 6,867 | 1,624 | 949 | 77,530 | 45,300 |
| Project Total | 47,736 | 4.47 | 1000 | 51:37:7:4 | 213,940 | 6,867 | 1,624 | 949 | 77,530 | 45,300 |
| ¹ | Platmin, as operator, currently has a 54.29% attributable interest in Mphahlele. |
| 2 | Vertical depth below surface. |